Vital-Quartier-Lindlar

Lindlar, Germany
Healthcare
5621,7
 m2
A building that stood the test of time
The Herz-Jesu Hospital in Lindlar was put into operation as early as 1891. In the course of time, there has always been a need for structural adaptations to the respective situation at the location, whereby the building substance existing today was created in various construction phases. The last building to be completed and put into operation was the existing medical center with a total of 4 medical practices and 9 doctors’ offices in 2002.

LOCATION

Lindlar, Germany

SECTOR

Healthcare

AREA

m2
5621,7

HEIGHT

HKM

UNITS

21

STATUS

Completed
Redisigning the past
No structural changes are planned in the existing medical center within the practices. However, the exterior façade of the building was fundamentally redesigned and brought into line with that of the medical center extension. This also visually created a functioning building ensemble.
Complete medical services integrated in one complex
After overall completion in 2020, the Vital-Quartier Lindlar will houses 30 senior citizens’ assisted living apartments, several dementia and psychiatric residential groups, a day care center, a restaurant, around 40 barrier-free apartments suitable for the elderly, and a specialist medical center.

Gallery